Calguns.net  

Home My iTrader Join the NRA Donate to CGSSA Sponsors CGN Google Search
CA Semiauto Ban(AW)ID Flowchart CA Handgun Ban ID Flowchart CA Shotgun Ban ID Flowchart
Go Back   Calguns.net > CONCEALED CARRY/LICENSE TO CARRY > Concealed Carry Discussion
Register FAQ Members List Calendar Mark Forums Read

Concealed Carry Discussion General discussion regarding CCW/LTC in California

Reply
 
Thread Tools Display Modes
  #1  
Old 08-22-2013, 8:13 AM
b_madeiros b_madeiros is offline
Member
 
Join Date: Aug 2012
Posts: 121
iTrader: 2 / 100%
Default Nevada CCW Timeline

Well since we don't have a timeline thread lets start one.
6/30 application submited to Douglas County Sheriff Minden, NV
8/21 was called, permit sent in mail. Permit recieved took 54 days

currently CA and AZ CCW holder

Last edited by b_madeiros; 08-27-2013 at 10:45 AM..
Reply With Quote
  #2  
Old 08-22-2013, 2:56 PM
seeedgar's Avatar
seeedgar seeedgar is offline
Junior Member
 
Join Date: Aug 2013
Location: S.F. Bay Area
Posts: 17
iTrader: 0 / 0%
Default

Quote:
Originally Posted by b_madeiros View Post
Well since we don't have a timeline thread lets start one.
6/30 application submited to Douglas County Sheriff Minden, NV
8/21 was called, permit sent in mail.
Thanks for starting this thread!!

Nevada: Applied 6/5/2013, Rcvd/Issued= 6/20/2013 (Nye County)
Utah: Applied 6/07/2013, Rcvd/Issued=8/10/2013
Florida: Applied 6/07/2013, Rcvd/Issued= 08/9/2013
__________________
Reply With Quote
  #3  
Old 08-25-2013, 12:20 AM
titan2 titan2 is offline
Senior Member
 
Join Date: Aug 2013
Location: Sacramento Area
Posts: 729
iTrader: 5 / 100%
Default

Boy, those two counties rock!!!

Washoe County.....applied 1 July 2013....still waiting 25 Aug 2013. Even though I've been told it takes between 90-120 days. Hopefully it will be here sooner rather than later.....would like to be carrying when we go see the grandkids the end of Sept first part of Oct.

Anybody else recently get their NV permits....this year?
Reply With Quote
  #4  
Old 08-25-2013, 7:06 AM
Rem222's Avatar
Rem222 Rem222 is offline
Senior Member
 
Join Date: Mar 2009
Location: SF BayArea
Posts: 1,284
iTrader: 12 / 100%
Default

Washoe County..... It was a week shy of 120 for my renewal. Hopefully yours will be faster.
Reply With Quote
  #5  
Old 08-25-2013, 8:20 PM
Cali-Glock's Avatar
Cali-Glock Cali-Glock is online now
CGN/CGSSA Contributor
CGN Contributor
 
Join Date: Mar 2005
Location: Sierra Nevadas
Posts: 2,921
iTrader: 2 / 100%
Default

From what I read, Nevada timelines are VERY dependent on the County where you apply. Mine was just shy of two weeks (Nye).
__________________
1 Corinthians 2:2

"May have been the losing side. Still not convinced it was the wrong one." - Mal Reynolds

"Auto racing, bull fighting, and mountain climbing are the only real sports ... all others are games."- Ernest Hemingway
Reply With Quote
  #6  
Old 08-26-2013, 5:30 AM
edwardm's Avatar
edwardm edwardm is offline
CGN/CGSSA Contributor
CGN Contributor
 
Join Date: Oct 2005
Location: Tacoma!
Posts: 1,835
iTrader: 20 / 100%
Default

Quote:
Originally Posted by titan2 View Post
Boy, those two counties rock!!!

Washoe County.....applied 1 July 2013....still waiting 25 Aug 2013. Even though I've been told it takes between 90-120 days. Hopefully it will be here sooner rather than later.....would like to be carrying when we go see the grandkids the end of Sept first part of Oct.

Anybody else recently get their NV permits....this year?
Settle in. Washoe is pushing the 120 day limit. 110 days for me to get mine (2 were mailing, so 108 days from application to issuance).
__________________
More regimes have been brought, piecemeal, to their knees by what was once called “Irish Democracy”—the silent, dogged resistance, withdrawal, and truculence of millions of ordinary people—than by revolutionary vanguards or rioting mobs.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT -8. The time now is 7:33 PM.




Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2016, vBulletin Solutions, Inc.
Proudly hosted by GeoVario the Premier 2A host.
Calguns.net, the 'Calguns' name and all associated variants and logos are ® Trademark and © Copyright 2002-2016, Calguns.net an Incorporated Company All Rights Reserved.